Wednesday, May 30, 2018
As of 5/24/18 the City of Ventura has issued 3 building permits for complete rebuild projects, the 3rd of which was for a Baker Engineering, Inc. project. To date Baker Engineering, Inc. has obtained permits on 2 fire damage repairs and 1 complete rebuild with another complete rebuild currently in plan check and another to be submitted within days.
Friday, May 22, 2015
Completed Pipe Line Suspension Bridge
Finally getting some pics up of the completed pipeline suspension bridge. 241 foot span, 40 foot elevation drop from high end to low end.
View along axis of bridge, people in the pic for scale.
Locked gate to prevent adventurous hikers from crossing.
Note the wheels left in place which were used to feed the pipe across the canyon in sections as it was assembled.
Monday, September 10, 2012
Keeping the rocks off the road
Took a family trip on Highway 1 this weekend. Marveled at Caltrans solution to rock slides which is under construction.
Wednesday, August 22, 2012
Pipeline suspension bridge
Concrete being poured this week for the primary abutments and outrigger foundations. Pics require some imagination at this point to visualize the alignment of the bridge.
Friday, May 4, 2012
Late 1800's Barn and Residence
Yes, there are barns in California. The previous post relates to this barn that we are rehabbing.
Surface drainage has been carrying dirt under the barn probably since it was originally built. There are two white owls living in the loft of this barn. I am hoping to get some photos of them, they are absolutely beautiful.
This two story Victorian house is also on the property and we are rehabbing it as well.
The primary structural problem with the house is sinking foundations along the outer edge of porch and brick chimneys that have collapsed in past earthquakes.
Surface drainage has been carrying dirt under the barn probably since it was originally built. There are two white owls living in the loft of this barn. I am hoping to get some photos of them, they are absolutely beautiful.
This two story Victorian house is also on the property and we are rehabbing it as well.
The primary structural problem with the house is sinking foundations along the outer edge of porch and brick chimneys that have collapsed in past earthquakes.
Thursday, May 3, 2012
Wood Rot
Roughly 12 inches of wood rim joist and mudsill are completely gone due to rot.
The space where a rim joist and mudsill previously existed is now filled entirely by dirt. The stone foundation wall is exposed in this photo, mortar has no binder material left and is now dry sand.
Friday, December 2, 2011
Existing Construction Wonders
I have to ask.....just how bright does a person have to be to know that maaaaaaybe this combination of water and electricity isn't such a good idea?